Views: 282 Author: KEENTOOL Publish Time: 2017-11-17 Origin: Site
Pile cutting can be one of the most important steps when constructing a deep foundation substructure.
In the beginning of 2017, KEENTOOL aggregated technology team complete the pile objection demilition project succesfully in Bangladesh. The project was to diving 10 piles which were fulfilled with concrete and bar steel underground, the depth was 17.5 meter, the diameter of pile was 1.5meter and wall thickness of pile was 42mm. The project requested for higher technology and precise diving core positioning.
Our wire saw devices and rubber & spring assembly diamond wire are capable of cutting and removing the reinforced concrete pile. Our technology is efficient and gets the job done quickly and safely. The work that would typically take multiple staffs and a great deal of equipment to accomplish can be done by only 2-3 worker and devices & auxiliary wire saw as below,
1) V7 Hydraulic station with remote control
2) U5 Wire Saw Machine Head 37KW
3) Updated U5 Underwater Cutting System
4) Diamond Wire for Underwater Cutting
Code No.G635B
40 beads per meter
Diameter 10.5mm
Our hydraulic cutting machine holds concrete piles in place at any angle. The detached pieces are then removed. This approach works with the same effectiveness for steel piles.
Subsea pile driving and cutting can prove to be one of the more difficult parts of construction due to the uncertainty subsurface environments. Please consider to choose experienced and leading technologies. when you have diving and demilition cutting works.
Thanks to the innovation and creative engineering of KEENTOOL!